Stormwater Company Brochure Design

Winner
Contest winning design

Want to win a job like this?

This customer received 32 brochure designs from 10 designers. They chose this brochure design from Monsterish as the winning design.

Join for free Find Design Jobs

  • Closed - Design Selected
  • Guaranteed

Brochure Design Brief

This project is for the development of a brochure to hand out to prospective clients. We're a small company who is trying to take on larger clients so it needs to really hammer home a sense of us being an established, professional company with unmatched service. The company works on retention ponds and stormwater systems doing maintenance, repair, inspection, and development. The brochure will be part of our first impression so it needs to be as interesting and striking as it can be, even though stormwater isn't the most interesting of topics.

Target Market(s)

Commercial property owners, people who have retention ponds, property managers, home depot, lowe's, target, wal-mart, anybody who owns a parking lot

Industry/Entity Type

It Company


Look and feel

Each slider illustrates characteristics of the customer's brand and the style your logo design should communicate.

Elegant
Bold
Playful
Serious
Traditional
Modern
Personable
Professional
Feminine
Masculine
Colorful
Conservative
Economical
Upmarket

Requirements
Must have
  • Should have some photos of stormwater related items. Ideally a retention pond and some sort of stormdrain with water running out of it would look nice.

    I have included copy for the brochure (which has more details and the stuff you'll need), the logo titled iss-2-darker, and some pics for the section "case study" which I'll type the copy for later.

    Judging by the content, it might be best as a bi-fold but I leave it up to your discretion.
Should not have
  • The company works on "stormwater systems" like things that handle the water from storms. We don't work on storms. So don't just make every entry have a bunch of pictures of storms. A picture of a storm might be alright, as long as it is focused on the stormwater part of the storm.

Files
Download all files - 0.9 MB
DOC
EPS
PDF
Payments
1st place
US$300
Participation payments x 3
US$20
Total
US$360

Project Deadline
12 Jul 2011 20:03:34 UTC
Language